FIRS Advert
News

Soludo awards more roads as residents decry non-commencement of work

Anambra State governor, Prof Chukwuma Soludo has awarded more roads in the state.

The roads were awarded during the Anambra Executive Council meeting. The roads include Achina-Onneh-Ogboji Road, selected Isuofia roads, Ifite Ogwari Road, Savinovo-Umuofor-Bright Street/Nkpor-Umuhu – Ubahuezike Road and Nnokwa-Adazi Enu-Akwaeze Road.

This is coming at a time when some residents of the state are already complaining that more than a month after the rain stopped, no work has commenced on roads flagged off around the state capital.

Anambra State Commissioner for Information, Mr Paul Nwosu in a press release said: “Anambra State Executive Council (ANSEC) has awarded more competitively bidded contracts to construct two new roads and reconstruct three (3) dilapidated ones in the state.

“The first is the Achina-Onneh-Ogboji road with a total length of 7.80 kilometres and width of 7.3 meters. The work will be done by IDC Construction Company Ltd at the cost of N4,950,000,000. and would be completed within 12 months from the date of mobilization.

“Selected Isuofia roads were awarded to Stefanutti Stocks Hapel Ltd at the cost of N5,310,000,000 The roads’ length which total 9.842 kilometres with an average width of 7.3 meters will be completed in 12 months.

“The reconstruction of Ifite-Ogwari road with spur of Ifite-Ogwari was awarded to New Idea Construction Ltd at the cost of N600,790,178:28. The job will be finished within 4 months from the mobilization date.”

Nwosu further said: “On the other hand, Savinovo-Umuofor-Bright Street/Nkpor-Umuhu-Ubahuezike road was split between two contractors for speedy completion of the construction work.

“Rojel Nigeria Ltd got 4.03 kilometres of the road while Hammakopp Consortium Ltd got 4.26 kilometres and the road has an average width of 7.3 meters. Rojel will complete its own part of the job in 6 months at the cost of N1,540,512,551.80 while Hammakopp will complete its own at the cost of N1,719,472,617.91 in 4 months.

“ANSEC also revalidated the construction works on Nnokwa-Adazi Enu-Akwaeze road at the revised cost of N2,900,654,846.00. The contract was awarded to Benejaf International Ltd and is expected to be completed within 12 months.

“All the contractors will be paid 30% of the contract sum as material advance, backed by an advance payment guarantee from a reputable bank with a branch in Anambra State.”

Meanwhile, some residents of Awka have expressed anger over the non-commencement of construction work on some roads within the state capital.

A businessman, Mr Okechukwu Eze said: “The Oby Okoli road, straight to Mgbakwu has been flagged off by the state government, and rain has long stopped, but we have not seen anything.

“Some people will say these are audio flag off, but the governor should not let people begin to think like that.”

Another respondent, a driver, Chijioke Ude said: “We have been clapping for the governor for the award of some very sensitive roads, but even as the rains have stopped, we are yet to see contractors mobilized to site.

“The governor must make good his words by ensuring that every road flagged off is commenced immediately. We don’t want all these delays so that by next year they will tell us that the rains have begun, and they can no longer finish them.”

 

 


Receive Alerts On:
Facebook: METRODAILYNG Twitter: @METRODAILYNG

REACH THE RIGHT PEOPLE AT THE RIGHT TIME WITH METRO DAILY NIGERIA. TRY AND ADVERTISE ANY KIND OF YOUR BUSINESS TO USERS ONLINE TODAY. KINDLY CONTACT US FOR YOUR ADVERTS OR PUBLICATIONS @ METRODAILYNG@GMAIL.COM or 08077778839. OR VISIT US AT OUR OFFICE AT
PLOT 273 REINSURANCE BUILDING
HERBERT MACAULAY WAY
2ND FLOOR, C WING, CENTRAL BUSINESS DISTRICT (CBD)
ABUJA – FCT.

Related Posts

Leave a Comment